Who gets codes, when, and for how long. A clear access protocol — code rotation, verification, contractor handling and an incident plan — so a lost code never becomes a break-in.
- Only verified, licensed agents get access, only for confirmed times
- Change codes on a schedule and after every “just in case”
- Separate contractor access from showing access
- Keep an audit trail of who received what
01The ground rules
02Rotating codes
| Change the code when… | Why |
|---|---|
| Monthly on active listings | Codes spread over time even when everyone behaves |
| After a contractor or inspector finishes | Their access should end with their job |
| After the home goes under agreement | Fewer people need in; the risk profile changes |
| Any time a code was shared outside your system | Assume it is public |
| If anything inside is out of place | Rotate first, investigate second |
03Vacant homes need more
- Consider accompanied showings or a camera at the entry (posted, and compliant with your state’s rules).
- Ask a neighbor to watch for cars at odd hours and call you, not the police, unless something is clearly wrong.
- Check thermostats and plumbing weekly in heating season — a frozen pipe costs more than a lost showing.
- Remove the spare key from under the mat. Every vacant home has one.
04Buyers without an agent
Direct buyers are welcome, but they meet you at the home. They never receive access codes, and their requests come straight to you so you can confirm the time and qualify them.
05If something goes wrong
- 1SecureChange the code or remove the box. Lock all doors.
- 2DocumentPhotos, the time you noticed, and the access log for the last week.
- 3NotifyYour broker first, then the seller. Police if there is damage or theft.
- 4ReviewWho had access? Was anything shared outside the system? Fix the gap.
General information, not legal advice. Requirements vary by state, town and brokerage — confirm with your broker or an attorney. © 2026 RequestEntry.